Select Page
Hip Roof Ventilation

澳洲幸运10线上投注

 

Step 1. Hip vents get ‘wafer’ cuts of 12” with 6” solid plywood intervals

Hip Roof Ventilation

Step 2. A full 4’ sheet with wafer cuts showing top and bottom uncut for 6” to gain cross strength.

Hip Roof Ventilation

Step 3. Another wafer cut picture showing 3 ½ “ overall cut (1 ¾ “ each side)

Hip Roof Ventilation

Step 4. Wafer cut showing two nails per uncut section (6” uncut, 12” wafer cut)

Hip Roof Ventilation

 
 

Hip Roof Ventilation

 

Do you have a question have a question about SmartRidge II?

 








    澳洲10开奖号码 澳洲8最新开奖号码 秒速飞艇走势软件 极速飞艇计划 澳洲10官方网站
    UA-275117-1